Examples of Serious Improvements for
Tenants at 112-114 Ferris Place
Here the brand new efficient, overcapacity furnace for 112 (left) and 114 (right: it is
installed vertical, Photo should be turned 90c clockwise) These keep the apartment
surely warm in Ithaca!
A small, thin metal column was the
original support material. You can see now
it is by far stronger than before with
additional support on both sides (by
courtesy of Nash Construction: 347-4273))
These improvement projects for
112-114 Ferris was financed by
Tompkins Trust Company, a
leading local bank in Ithaca, NY
(Courtesy: Mr. Steve Bacon,
VP, 607-273-3210).
The work were undertaken  by
Seamon Plumbing and
Heating
(533-7368), Bear Electric
(272-5994) and
Nash
Construction
(347-4273).
Thank you very much, all!
Back to 112-114 Ferris
Home


Here is the reinforcement of support columns
for the porch. Pressured thick wood and new
concrete basis are the addition of the project,
making the porch strong enough for
overcapacity to ensure maximum safety for
tenants.