| Examples of Serious Improvements for Tenants at 112-114 Ferris Place |
||||||||||||||||||
| Here the brand new efficient, overcapacity furnace for 112 (left) and 114 (right: it is installed vertical, Photo should be turned 90c clockwise) These keep the apartment surely warm in Ithaca! |
||||||||||||||||||
![]() |
||||||||||||||||||
![]() |
||||||||||||||||||
![]() |
||||||||||||||||||
![]() |
||||||||||||||||||
| A small, thin metal column was the original support material. You can see now it is by far stronger than before with additional support on both sides (by courtesy of Nash Construction: 347-4273)) |
||||||||||||||||||
| These improvement projects for 112-114 Ferris was financed by Tompkins Trust Company, a leading local bank in Ithaca, NY (Courtesy: Mr. Steve Bacon, VP, 607-273-3210). The work were undertaken by Seamon Plumbing and Heating(533-7368), Bear Electric (272-5994) and Nash Construction(347-4273). Thank you very much, all! |
||||||||||||||||||
| Back to 112-114 Ferris Home |
||||||||||||||||||
| Here is the reinforcement of support columns for the porch. Pressured thick wood and new concrete basis are the addition of the project, making the porch strong enough for overcapacity to ensure maximum safety for tenants. |